settings
Adventure Cap
Price
Options
Colour
Size
Quantity
minimum quantity: x available in bundles of: x Product ordered in bundles.
Customize Design
Add to Cart
*GST included for NZ customers
Sizing Details
Size Guide
| ONE SIZE | |
|---|---|
| Circumference (cm) | 59 |
| Height (cm) | 9 |
Icon Nylon Cap - AS Colour
Lower profile six panel cap, curved peak
Structured snapback cap with a contoured crown
Plastic snapback, eyelets, tonal under-peak lining
Mid weight
100% quick dry recycled nylon
One size fits all
Tear-out AS Colour label
Please note the design will be centred on the front of the cap.
View Description
Hide Description

