Crew neck - Stacked Light
Price
Options
Colour
Size
Quantity
minimum quantity: x available in bundles of: x Product ordered in bundles.
Sizing Details
Size Guide
| XS | S | M | L | XL | 2XL | 3XL | 4XL | 5XL | |
|---|---|---|---|---|---|---|---|---|---|
| Body Width (cm) | 43 | 47 | 52 | 56.5 | 61 | 64 | 68 | 75 | 80 |
| Body Length (cm) | 68 | 71 | 75 | 78.5 | 82 | 83.5 | 85 | 87 | 89 |
Mens Staple Tee - AS Colour
Fit: Regular
Fabric: Mid weight, 180 GSM, 28-singles, 100% combed cotton (marles 15% viscose)
Construction: Neck ribbing, side seamed, shoulder to shoulder tape, double needle hems, preshrunk to minimise shrinkage
UPF Rating - 50+
**Please note Army/Charcoal/Coal can be susceptible to fading/colouration variance. Also, particular sunblocks or deodorants mixed with high levels of sun exposure/body sweat can cause bleaching of the dyes in these colours - please consider when ordering.**
Width measurements are from seam to seam, under the armpit, with the garment lying flat.
Length measurements are from shoulder seam to bottom of garment, with the garment lying flat.
Please note measurements can vary +/- 2.5cm - this is within the manufacturer's tolerance.

