XMAS ORDERS CLOSE 13 DECEMBER | 3–5 WORKING DAYS + SHIPPING | FREE NZ SHIPPING OVER $300

Logo Horizontal

    Price

    Options

    Colour

    Size

    Quantity

    Customize Design
    Add to Cart
    *GST included for NZ customers

    Sizing Details

    Size Guide

      S M L XL 2XL 3XL
    Half Chest (cm) 46 51 56 61 66 71
    Body Length (cm) 71 74 76 79 81 81

    Mens Softstyle T-Shirt - Gildan

    Fit: Active Fit

    Fabric: 100% Ring Spun Cotton *Fabrics vary for different colours
    Weight: 153 g/m2
    Sizes: S, M, L, XL, 2XL, 3XL

    • Preshrunk jersey knit
    • High stitch density for smoother printing surface
    • Seamless double-needle 1.9 cm collar
    • Taped neck and shoulders
    • Tear away label
    • Rolled forward shoulder
    • Double-needle sleeve and bottom hems
    • Quarter-turned to eliminate centre crease
    • Fibre content varies by colour, see colour list for exceptions
    • Case Packs: S – 2XL: 72 pieces, 3XL: 72 pieces* Sport Grey = 90% Cotton / 10% Poly. Dark Heather, Graphite Heather = 50% Cotton / 50% Polyester

    Please note charcoal garments are more susceptible to fading due to common environmental factors such as a combination of NZ sun/UV Rays and the dye makeup. Please consider when ordering.

    Width measurements are from seam to seam, under the armpit, with the garment lying flat.
    Length measurements are from shoulder seam to bottom of garment, with the garment lying flat.
    Please note measurements can vary +/- 2.5cm - this is within the manufacturer's tolerance. 

    View Description
    Hide Description

    Select Currency

    {CC} - {CN}
     

    Select Size

     

    Extra Product Options

       
       
       
       
       
       
       
       
       
       

      Please enter your Layout name

       
       
       

      Select Type Of TextSelect Type Of Team nameSelect Type Of DesignSelect placeholder type

      Softer feeling print, best for cotton fabric and large prints
      Full colour, no minimum quantity
      Thicker feeling print, not suitable for glows, fades, transparency
      Softer feeling print, best for cotton fabric and large prints
      Full colour, no minimum quantity
      Thicker feeling print, not suitable for glows, fades, transparency
      Softer feeling print, best for cotton fabric and large prints
      Full colour, no minimum quantity
      Thicker feeling print, not suitable for glows, fades, transparency
      Softer feeling print, best for cotton fabric and large prints
      Full colour, no minimum quantity
      Thicker feeling print, not suitable for glows, fades, transparency
       

      Please enter your text

       

      Select a design

      Please wait while the image gallery loads

       
       
       

      Confirm Request Quote

      You will be redirected to a page where you can request a quote for this blank product. Any decorations you have added to this product will be removed.

       

      Select product

      Select product

        Products

         

        How many colours are in this design?

        You now have multiple elements making up this screenprint design

        Select the colours that appear in your design.

        You need to specify the total number of unique colours used across all the elements in your design.

        This helps us determine the pricing based on the number of colours in your design.

        • (plus white base)

        You can also specify the colours used in your design eg "Red", "Blue", "pantone 1809".

        If you dont tell us, our professional designer will work it out for you.

        • (plus white base)

        Currently selected Colours

         

        How many colours are in this design?

        • coloured image
        • original image

        How many colours in your design?

        4 Colours

        Select the colours to be used

          COLOR PICKERS GO HERE
         

        Your Cart

        Products Qty Price
        Total $0.00
         

        Re-use existing screen print designs

        You have already used screen printing in this order. To avoid additional screen costs you can re-use an existing screen print design for this product.

        You can

        Re-use existing designs

        or

         

        WarningError

        Your layout contains images that have been resized to the point where they may appear blurred.

        Below-quality images listed

        Your layout contains images that appear outside the design area.

        You cannot save the product until you have moved the images within the design area.

        Your layout contains images that appear outside the design area.

        Your layout contains overlapping images.

        You cannot save the product until you have moved the images so they are not overlapping.

        Blank product purchase is not allowed

        You will not be able to purchase this product until you add a decoration design.

        Inactive blank product in use

        Product minimum quantity requirements not met

        You will need to increase the specified quantity to add this item to your cart.

        Process minimum quantity requirements not met

        Screen(s) still updating...

        You will not be able to purchase this item until all re-used screens have been updated.

        Your layout contains images that have been resized to meet the 25 megapixel limit for raster images and they may appear smaller than intended. You can avoid the raster size limit by uploading artwork in vector format when possible.

        By clicking OK, you are agreeing to accept the final product regardless of image quality. Click Cancel if you want to go back and fix the images.

         

        Add Team name

         

        Edit Team name.

        Add Another Team name
         

        Uploading file