settings
Logo Horizontal
Price
Options
Colour
Size
Quantity
minimum quantity: x available in bundles of: x Product ordered in bundles.
Customize Design
Add to Cart
*GST included for NZ customers
Sizing Details
Size Guide
| XS | S | M | L | XL | 2XL | 3XL | 4XL | 5XL | |
|---|---|---|---|---|---|---|---|---|---|
| Width | 49 | 52 | 55 | 58 | 61 | 64 | 67 | 70 | 73 |
| Length | 69.5 | 72 | 74.5 | 77 | 79.5 | 82 | 84.5 | 85.5 | 86.5 |
| Women's Size | 10 | 12 | 14 | 16 | 18 | 20 | 22 | 24 | 26 |
Men's Supply Hood - AS Colour
Regular fit
Mid weight, 290 GSM
80% cotton 20% polyester anti-pill fleece
Pullover hood, raglan sleeves, kangaroo pocket, lined hood, tonal drawcord
Sleeve cuff ribbing, preshrunk to minimise shrinkage
Width measurements are from seam to seam, under the armpit, with the garment lying flat.
Length measurements are from shoulder seam to bottom of garment, with the garment lying flat.
Please note measurements can vary +/- 2.5cm - this is within the manufacturer's tolerance.
View Description
Hide Description

