settings
Polo - Blue Vertical Stacked Logo
Price
Options
Colour
Size
Quantity
minimum quantity: x available in bundles of: x Product ordered in bundles.
Customize Design
Add to Cart
*GST included for NZ customers
Sizing Details
Size Guide
| S | M | L | XL | 2XL | 3XL | 4XL | 5XL | |
|---|---|---|---|---|---|---|---|---|
| Body Width (cm) | 47 | 50.5 | 54 | 57.5 | 61 | 64.5 | 68 | 71.5 |
| Body Length (cm) | 74 | 76 | 78 | 80 | 82 | 84 | 85 | 86 |
Mens Chad Polo - AS Colour
Regular fit
Short sleeve collared polo shirt, 3 button placket, tonal buttons, split detail at sides
Heavy weight, 220 GSM, 20-singles
100% combed cotton (marles 15% viscose)
Side seamed, double needle hems, preshrunk to minimise shrinkage
Width measurements are from seam to seam, under the armpit, with the garment lying flat.
Length measurements are from shoulder seam to bottom of garment, with the garment lying flat.
Please note measurements can vary +/- 2.5cm - this is within the manufacturer's tolerance.
View Description
Hide Description

