settings
Runn Logo - Vertical Light
Price
Options
Colour
Size
Quantity
minimum quantity: x available in bundles of: x Product ordered in bundles.
Customize Design
Add to Cart
*GST included for NZ customers
Sizing Details
Size Guide
| XS | S | M | L | XL | 2XL | |
|---|---|---|---|---|---|---|
| Body Width (cm) | 47.5 | 50 | 52.5 | 55 | 57.5 | 60 |
| Body Length (cm) | 44 | 45 | 46.5 | 47.5 | 48.5 | 49.5 |
Women's Crop Tee - AS Colour
Relaxed fit
Crew neck
Mid weight, 180g / 5.3oz, 28-singles
100% combed cotton (heathers 15% viscose)
Short body, dropped shoulders, neck ribbing, side seamed, shoulder to shoulder tape, double needle hems, preshrunk to minimise shrinkage
Width measurements are from seam to seam, under the armpit, with the garment lying flat.
Length measurements are from shoulder seam to bottom of garment, with the garment lying flat.
Please note measurements can vary +/- 2.5cm - this is within the manufacturer's tolerance.
View Description
Hide Description

