Runn Values Tangram
Price
Options
Colour
Size
Quantity
minimum quantity: x available in bundles of: x Product ordered in bundles.
Sizing Details
Size Guide
| XS | S | M | L | XL | 2XL | 3XL | |
|---|---|---|---|---|---|---|---|
| Body Width (cm) | 45.5 | 48 | 50.5 | 53 | 55.5 | 58 | 60.5 |
| Body Length (cm) | 63.5 | 64.5 | 65.5 | 66.5 | 67.5 | 68.5 | 69.5 |
Women's Maple Tee - AS Colour
Regular fit
Crew neck
Mid weight, 180 GSM, 28-singles
100% combed cotton (marles 15% viscose)
Neck ribbing, side seamed, shoulder to shoulder tape, double needle hems, preshrunk to minimise shrinkage
**Please note the colour Charcoal can be susceptible to fading/colouration variance with excessive sun exposure – please consider this when ordering for uniforms.**
Width measurements are from seam to seam, under the armpit, with the garment lying flat.
Length measurements are from shoulder seam to bottom of garment, with the garment lying flat.
Please note measurements can vary +/- 2.5cm - this is within the manufacturer's tolerance.

