settings
Stacked Blue
Price
Options
Colour
Size
Quantity
minimum quantity: x available in bundles of: x Product ordered in bundles.
Customize Design
Add to Cart
*GST included for NZ customers
Sizing Details
Size Guide
| XS | S | M | L | XL | 2XL | |
|---|---|---|---|---|---|---|
| Body Width (cm) | 48 | 51 | 54 | 57 | 60 | 63 |
| Body Length (cm) | 69 | 72.5 | 75 | 77.5 | 80 | 82.5 |
Men's Premium Crew - AS Colour
Relaxed fit
Heavy weight, 350 GSM
100% Cotton French Terry
Inset sleeves, 2x2 ribbing on neck, cuff and hem
Cover stitching on seams, preshrunk to minimise shrinkage
Width measurements are from seam to seam, under the armpit, with the garment lying flat.
Length measurements are from shoulder seam to bottom of garment, with the garment lying flat.
Please note measurements can vary +/- 2.5cm - this is within the manufacturer's tolerance.
View Description
Hide Description

